PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started laying out block at the detention cells Facing South-East.jpg Bathroom 220 roughing Facing North-West.jpg Bathroom 234 Roughing Facing West.jpg Continued installing ductwork at the 3rd floor Facing East.jpg Hot water supply - return piping at the 4th floor Facing West.jpg Installed metal clips along the top roof perimeter for the parapet Facing East.jpg Installed sheet rock at the lower roof Facing West.jpg Installed the hot water supply and return at the 2nd - 4th floor Facin West.jpg Installing ductwork fitters at the 2nd floor Facing North.jpg
Previous pageNext page Hot water supply - return piping at the 4th floor Facing West
Hot water supply - return piping at the 4th floor Facing West